search

Wind turbine Emsdetten

The first wind turbine of Green City Energy was established in cooperation with local partners in Emsdetten in the region of Münster.

Data & Facts
  • Location and site
    Veltrupper Feld, region of Münster, North Rhine-Westphalia
  • Number/type of turbines
    1 Enercon E 82
  • Capacity per plant total
    2 MW
  • Hub height/total height
    108 m / 149,5 m
  • Rotor diameter
    82 m
  • Forecast electricity production p.a.
    4.000 MWh
  • Households supplied
    approx. 1.176
  • Commissioned
    2010